Astrobase Space Technologies: valuation, funding, and the secondary tape
the mark
the record below
claimed valuation
n/a
not on record
last priced round
n/ano priced round
Clarity tape
n/a
no print on record
claim vs round
n/acomputed where comparable
No claimed valuation on record. No secondary tape print on record.
sources: graph records - the same records as the table below
The record
| instrument | value | as of | source |
|---|---|---|---|
| Claimed valuation | n/a | graph | |
| Napkin: new-money stake | 13.9% ($10.00M of $72.00M) | 2025-07-02 | source |
| Open roles (tracked board) | 73 | source | |
| Federal contract total | $0 across 0 awards | source |
Funding rounds on record
| date | amount | post-money | source |
|---|---|---|---|
| 2025-07-02 | $10.00M | $72.00M | source |
All filed/seeded rounds in the graph, newest first; same-month same-amount prints collapse to one line.
Investors on record
BanyanCo
Corporate structure
- Competes with (graph-recorded): Agnikul Cosmos, Skyroot Aerospace
Related companies
- Sector peers: Agnikul Cosmos, Astro Aerospace, Edge Aerospace, Kepler Communications, Redwire Space, Roccor
Recent milestones
- 2026-11-13 - Astrobase Space Technologies announced an ₹800 crore investment in Andhra Pradesh and plans to expand its rocket-testing site by 339 acres,
- 2026-11-03 - Hot-fire campaign pre-qualification: Astrobase began qualifying its water deluge system, sized at roughly one tonne of water per second (~1,
- 2026-11-03 - KARNATAKA ENGINE PLANT ANNOUNCED -- a PROPOSED investment, not a funding round: state industries minister M.B. Patil announced Astrobase pla
- 2026-09-30 - Capacity ambition stated: 1,000 tonnes of payload to orbit per year, built on the EVEREST methane engine and a reusable vehicle now moving t
- 2026-09-02 - REPORTED, NOT CLOSED: in talks to raise $40-50M led by Peak XV Partners at a ~$250-300M valuation ('people aware of the matter', ET) -- roug
- 2026-08-07 - EVEREST unveiled: India's first full-flow staged combustion rocket engine -- 800 kN, 80-tonne class, LOX-methane, designed and manufactured
- 2026-08-07 - INDEPENDENT READ ON THE UNVEILING (same day, trade press): the engine had NOT yet been hot-fired and no test schedule was announced; sub-sca
- 2026-06-10 - Selected under IN-SPACe's Technology Adoption Fund (TAF) to develop the indigenous 800 kN closed-cycle LOX-LNG engine -- one of the first th
- 2026-05-12 - Strategic partnership framework signed with Italy's Impulso Space at Space Meetings Veneto 2026, inside the IN-SPACe-led Indian aerospace de
- 2026-03-30 - India's largest industrial 3D printer arrived at the Bengaluru facility, taken as the additive-manufacturing layer for FFSC engine productio
marks table | napkin table | the scorecard | all companies | methodology | hiring watch (live)
Derived from the SOMEN graph at render time.